We are proud to announce that MetriCorr has been awarded a contract by Ørsted to deliver corrosion and cathodic protection monitoring for the groundbreaking Hornsea 3 Offshore Wind Farm. With a capacity of 2.9 GW, Hornsea 3 will produce enough renewable electricity to power more than 3.3 million UK homes, making a significant contribution to the UK government’s ambition of having 50 GW offshore wind in operation by 2030 as part of the British Energy Security Strategy.
With MetriCorr’s state-of-the-art remote monitoring technology, we will support Ørsted’s mission to ensure the long-term integrity, reliability, and efficiency of critical offshore structures. By providing real-time insights into corrosion risks and cathodic protection performance, our solution will help optimize maintenance, extend asset lifetimes, and contribute to the success of this landmark project.
We are honored to support Ørsted in their mission and look forward to a strong and successful collaboration.